Mr. Payne is a professional engineer with 33 years of experience in planning, design, construction management and operational optimizations. Through Payne Environmental Consulting, uses his background in utilities operations and design to provide executive level consulting to public utility agencies.
DEMONSTRATED INNOVATION
Currently working with the U.S. Department of Interior to plan a new reservoir in the Sierra Nevada region of California & working for El Dorado County to secure an area-of-origin water right of up to 40,000 acre-feet.
Prepared the operational assessment and cost-of-service study for SSWD to optimize services. Results of the studies were used to assess possible consolidation with an adjacent water district.
Copyright © Kenneth Payne. All rights reserved.
Recently represented Sacramento Suburban Water District (SSWD) to secure their federal long-term water entitlement contract under a Long-term Warren Act Contract for 29,000 acre-feet of water supply from Folsom Reservoir